Design your data center
Enter IT load, PUE, rack density, Tier and redundancy. The tool produces a full preliminary equipment breakdown — generators, transformers, UPS, PDUs, chillers and CRAH units — with indicative capex and lead time.
Rough estimate only — not a final engineered design.
Output is for budgeting and early-stage planning. Final equipment selection requires site-specific load profiles, single-line diagrams, coordination studies, code review (NEC, NFPA 110, ASHRAE 90.4) and stamped drawings from a licensed engineer.
01
IT load
Server & network equipment power
02
PUE target
Power Usage Effectiveness (facility load ÷ IT load)
03
Rack density
Average kW per rack
04
Uptime Institute Tier
Availability classification
Tier III requires N+1 redundancy minimum and 72-hour on-site fuel storage.
05
Redundancy topology
For power & cooling units
06