Generators
20 kW – 4 MW · Diesel · Gas · Bi-fuel
- Standby & prime power gensets
- Paralleling switchgear & ATS
- Sound-attenuated enclosures
- Sub-base & belly fuel tanks
- Load bank testing & commissioning
SPM engineers, supplies and services generators, transformers and HVAC systems for data centers, hospitals, utilities and heavy industry — with lead times measured in weeks, not quarters.
// Authorized distributor & service partner
Enter your IT load, PUE, rack density, Tier rating and redundancy. Get a full equipment breakdown — generators, transformers, UPS, PDUs, chillers and CRAH units — sized from 100 kW edge cabinets up to 5 GW AI mega-campuses.
Traditional power generation throws away most of its fuel as waste heat. Our trigeneration system captures it — a solid-oxide fuel cell generates electricity at 60% efficiency, then its 500°C exhaust drives a lithium-bromide absorption chiller for cooling instead of being vented to atmosphere.
From 20 kW standby gensets to 50 MVA substation transformers and 1,000-ton chiller plants — one supplier, one project manager, one warranty.
20 kW – 4 MW · Diesel · Gas · Bi-fuel
15 kVA – 50 MVA · Pad · Pole · Substation
5 – 1,500 tons · Chillers · RTUs · VRF
In-house PEs run load studies, short-circuit and coordination analysis, and arc-flash modeling so the spec lands right the first time.
Direct OEM allocations and three regional staging yards. We expedite, crate, and dispatch — including over-dimensional permits.
N+1 to 2N redundancy. Concurrent maintainability. Sub-cycle ATS.
→NFPA 110 Level 1. Essential, equipment & life-safety branches.
→Substation transformers, mobile subs, distribution rebuilds.
→Process cooling, prime power, peak-shave gensets.
→Class I Div 2 rated packages. Gas & bi-fuel gensets.
→BAA/TAA compliant. Sec. 889 vetted supply chain. GSA schedule.
→Supplied (7) 2 MW Cummins QSK60 generators in 2N configuration with paralleling switchgear and 24,000 gallons of belly-tank fuel storage. Commissioned in 11 weeks against a 16-week budget.
NFPA 110 compliant essential power system upgrade — 3× 1.5 MW gensets, dual 2,000 A ATS, and full-load testing during a live-facility cutover with zero patient impact.
Two 25 MVA station-class transformers delivered on accelerated 14-week build, with full protective relay packages and SCADA integration.
SPM turned what should have been a 9-month transformer lead-time into 14 weeks, and had crews on site the day it landed. They're the only supplier we trust for fast-track work now.
Real engineers, not a form-routing bot. Send us a one-line, a single-line diagram, or a full spec package — we'll come back with sizing, pricing and lead time.